Big question for the tenured here. We're having plans drawn up for a new office, and we are trying to squeeze in as much as possible into a 5,000 sq ft. footprint. As is, there's a 10x20 room with a 3 doors entering and exiting. I'm not sure on the counter space footage yet. We're planning on having 1 generator, 1 set of lap towers, 1 set of surfacing cabinets, a blocking area, 1 tracer and edger, and then stock lenses, a tinting station, drill mount equipment, etcher and some other miscellaneous stuff. It seems doable, but we've got a 30x30 lab now that is a waist of space so I'm having a hard time envisioning how tight it would be. I've attached a close-up of the plans we are looking at. Any thoughts?
Bookmarks